The challenge
Damaged piping had to be replaced with no drawings on board and a departure date already fixed.
ANCHOR HANDLER · FABRICATION
Design, fabrication and installation of replacement piping during a short port stay.
Damaged piping had to be replaced with no drawings on board and a departure date already fixed.
Sections were measured on board, fabricated in the local workshop and fitted on the vessel; a second urgent batch followed the same route.
The piping was installed and tested before departure.